Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and operation of the car



Toyota 4ranner
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   - 3.1. 4-cylinder engines
      3.1.1. Specifications
      3.1.2. The types of repair which are carried out without removal of the engine from the car
      3.1.3. Installation of the piston of the 1st cylinder in compression step VMT
      3.1.4. Cover of a head of cylinders
      3.1.5. The soaking-up collector
      3.1.6. Final collector
      3.1.7. Cam-shafts and pushers
      3.1.8. Head of cylinders
      3.1.9. Cover of the chain drive of cam-shafts
      3.1.10. Forward epiploon of the crankshaft
      3.1.11. Oil pallet
      3.1.12. Oil pump
      3.1.13. Flywheel (drive plate of the hydrotransformer)
      3.1.14. Back epiploon of the crankshaft
      3.1.15. Engine mount details
   + 3.2. V6 3,0 engines of l (1993-1994) and 3,4 l (since 1995)
   + 3.3. Dismantle and capital repairs of the engine
+ 4. Systems of heating, ventilation
+ 5. Fuel and exhaust systems
+ 6. Transmissions
+ 7. Transmission elements
+ 8. Brake system
+ 9. Suspension bracket and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electrical circuitries


2403db43

3.1.6. Final collector

GENERAL INFORMATION

Prevention

Works are performed on the cold engine.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. On the engines equipped with PAIR system (pulse system of injection of fuel) remove system of the tubes and valves close to a collector.
3. Turn off bolts (are specified by shooters) and remove thermal screens.
4. Moisten nuts and bolts of a final collector and a nut of fastening of an exhaust pipe to a collector with the getting liquid. After wetting turn off nuts of fastening of an exhaust pipe (see subsection 5.12).
5. Turn off nuts and bolts of fastening (are specified by shooters) and remove a collector and laying.
6. Clear the demountable planes of a collector and a head of cylinders of the remains of material of laying and deposits of a deposit. If leak signs through laying are observed, then check deformation of the demountable plane of a collector in a specialized workshop, if necessary a proshlifuyta.
7. Dress new laying on hairpins of a head of cylinders.

Prevention

Tags on laying have to be turned from a head of cylinders aside.


8. Establish a collector and wrap bolts and nuts on former places.
9. Tighten nuts and bolts in three-four receptions with the set moment (it is specified in subsection 3.1.1). Tighten bolts and nuts from the center to the periphery of a collector.
10. Establish other details as it should be, the return to dismantling.

11. Start the engine and check tightness of connections of a final collector.