Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and operation of the car



Toyota 4ranner
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. 4-cylinder engines
   - 3.2. V6 3,0 engines of l (1993-1994) and 3,4 l (since 1995)
      3.2.1. Specifications
      3.2.2. The types of repair which are carried out without removal of the engine from the car
      3.2.3. Installation of the piston of the 1st cylinder in compression step VMT
      3.2.4. Covers of heads of cylinders
      3.2.5. The soaking-up collector
      3.2.6. Final collectors
      3.2.7. Belt of an asterisk of cam-shafts
      3.2.8. Forward epiploon of the crankshaft
      3.2.9. Epiploons of cam-shafts
      3.2.10. Cam-shafts and pushers
      3.2.11. Heads of cylinders
      3.2.12. Oil pallet
      3.2.13. Oil pump
      3.2.14. Flywheel (drive plate of the hydrotransformer)
      3.2.15. Back epiploon of the crankshaft
      3.2.16. Engine mount details
   + 3.3. Dismantle and capital repairs of the engine
+ 4. Systems of heating, ventilation
+ 5. Fuel and exhaust systems
+ 6. Transmissions
+ 7. Transmission elements
+ 8. Brake system
+ 9. Suspension bracket and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electrical circuitries


Samsung LE32B450C7WXRU прошивка 2403db43

3.2.6. Final collectors

GENERAL INFORMATION

Prevention

Works are performed on the cold engine.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Moisten nuts and bolts of a final collector with the getting liquid.
3. Remove connecting section of an exhaust pipe in a back part of a head of cylinders (the drawing at the left – fastening of connecting section (3,0 l), the drawing on the right – fastening of connecting section (3,4 l).
4. Turn out the recirculation tube union from a collector.
5. Turn off nuts and bolts of fastening and remove collectors.
7. Attentively check a condition of a collector and fastenings.
8. Clear the demountable planes of a collector and a head of cylinders of the remains of material of laying and deposits of a deposit. If leak signs through laying are observed, then check deformation of the demountable plane of a collector, if necessary to a proshlifuyta.
9. Dress new laying on hairpins of heads of cylinders.
10. Establish collectors, wrap nuts on former places.
11. Tighten nuts in three-four receptions with the set moment. Tighten bolts and nuts from the center to the periphery of a collector.
12. Establish other details as it should be the return to dismantling.
13. Start the engine and check tightness of connections of a final collector.